Leave a Message

By providing your contact information to The Lotzof Group, your personal information will be processed in accordance with The Lotzof Group's Privacy Policy. By checking the box(es) below, you consent to receive communications regarding your real estate inquiries and related marketing and promotional updates in the manner selected by you. For SMS text messages, message frequency varies. Message and data rates may apply. You may opt out of receiving further communications from The Lotzof Group at any time. To opt out of receiving SMS text messages, reply STOP to unsubscribe.

Thank you for your message. We will be in touch with you shortly.

Single-story modern hillside home with a board-formed concrete wall, wood eaves, and multi-trunk trees.

Solana Beach's Fall Construction: Trail and Lomas Santa Fe Projects

Have you noticed Highway 101 feels tighter lately near Fletcher Cove, or that Lomas Santa Fe has orange cones where there weren't any last month? You're not imagining it. Solana Beach has two infrastructure projects moving into construction this season: the Coastal Rail Trail extension, which reduces Highway 101 from two travel lanes to one, and the Lomas Santa Fe Corridor project.

Neither project is new news exactly. The Coastal Rail Trail gap at the north end of town has been there since the early 2000s. As The Coast News reported, the Lomas Santa Fe Corridor project has been in some form of study, workshop, or design review since 2015. What's new is that both are moving into construction in the same window, though the lane reduction is part of the Coastal Rail Trail extension.

The Coastal Rail Trail Extension

According to The Coast News, the trail runs from Via de la Valle at the city's southern border north to Ocean Street, a stretch that gets plenty of daily use from people walking or biking to the Solana Beach Transit Center. Then it just stops, a few blocks short of the Encinitas line, and cyclists get dumped onto the shoulder of Highway 101.

The fix has been funded since January, when Solana Beach accepted $300,000 in state money toward the roughly $1 million project needed to extend the trail those final blocks. As The Coast News reported, the design presented to the City Council in late June solved a real problem: extending the trail on the west side would have cut through a conservation easement along Harbaugh Seaside Trails. The workaround pushes the path into the Highway 101 right of way instead, which means the stretch north of Solana Vista Drive drops from two travel lanes to one.

City Engineer Austin Frisby called it the most workable option that stays inside the existing roadway. City Manager Alyssa Muto has been clear that Solana Beach intends to finish its portion regardless of what happens next door, telling the council the design work lets the city keep moving forward on its own timeline. Construction is expected to start this fall, with the whole extension wrapped by March 2028.

For about a year and a half, drivers on this stretch of coast highway will have one travel lane instead of two as the bike and pedestrian path closes a gap two decades in the making. If you use that stretch of 101 to get to the grocery store or the train, the lane reduction will affect your commute.

Why "Finished" Won't Mean Connected

The trail will still end at the Encinitas border after Solana Beach completes its extension; a connection into Encinitas depends on a separate crossing project.

The connection was supposed to come from a joint project: a pedestrian crossing at Highway 101 linking Harbaugh Seaside Trails to Cardiff State Beach. Encinitas secured a $350,000 Caltrans grant for exactly that crossing. The lane reduction required by the design was not adopted, and the two cities are now working through alternate concepts. The crescent-shaped platform that currently marks the trail's dead end will be replaced with landscaping, not a through-connection.

Councilmember Dave Zito made a smaller but telling point during the same council session: most people already ignore the signage that tells them to walk a quarter mile south to the safer crossing at Solana Vista Drive. The city's plan is to try catching pedestrians earlier, before they reach Harbaugh, rather than assuming better signs will change behavior that's already established.

A continuous ride or walk from Fletcher Cove into Encinitas by 2028 would depend on a negotiation that hasn't been resolved yet.

The Lomas Santa Fe Corridor Project

While that plays out on the coast, a second, larger project is landing on the inland side of town. The Lomas Santa Fe Corridor project has been the subject of community workshops since 2018 and design revisions that at one point considered roundabouts before settling on a simpler layout. The eastern segment, running one mile from Santa Helena to the city's boundary at Highland Drive, has a contractor. In late May, the council awarded a $7.4 million construction contract to Tri-Group Construction, and the city's own project page lists construction running from September 2026 through fall 2027.

The scope is bigger than the trail project: new paving, sidewalks, a multi-use trail, bike lanes, landscaped medians, benches, decorative crosswalks, and new traffic signals. The funding stacked up over years rather than months. Rep. Mike Levin secured $7 million in federal money for the eastern segment back in 2023. SANDAG added $3.5 million toward the still-unfinished western portion earlier this year. Deputy Mayor Jill MacDonald, whose district includes the corridor, said her first City Council meeting years ago was likely a discussion of this same project, reflecting its long planning history.

Senior Civil Engineer Anda Wright told the council the city has built in non-working days around the opening of the San Diego County Fair and the first week of the school year specifically to limit traffic disruption during the periods that matter most to families and commuters. At least one travel lane will stay open in each direction throughout construction, and the city has set up a dedicated hotline and email address for residents to flag problems as they come up.

What This Actually Looks Like If You Live Here

Two infrastructure projects, both years in the making, both landing in the same season:

  • Highway 101 north of Solana Vista Drive goes from two lanes to one starting this fall, for the Coastal Rail Trail's final extension to the Encinitas border, with completion targeted for March 2028.
  • The trail's connection into Encinitas itself is not resolved. That depends on a separate crossing project the two cities are still negotiating.
  • Lomas Santa Fe Drive between Santa Helena and Highland Drive is under construction from September 2026 through fall 2027, with at least one lane open in each direction and a city hotline for construction issues.
  • The city has already shown it can finish smaller commitments on schedule. The Fletcher Cove ramp rehabilitation and shower tower project was completed earlier this year, a small item next to a highway redesign but a sign the city follows through on the maintenance side, not just the ribbon-cutting side.

If your daily route touches either corridor, the next year and a half looks different than the last five. A continuous bike and pedestrian path along the coast highway remains a possible longer-term outcome if the Encinitas connection is resolved; the rebuilt inland corridor is supposed to carry BikeWalkSolana's long list of walkability requests. The near-term reality is construction on both streets: Highway 101 north of Solana Vista Drive will have one travel lane instead of two, while at least one lane stays open in each direction on Lomas Santa Fe.

None of this changes what has always made this stretch of coast worth living in. It does mean the version of Solana Beach you'll be driving through next spring won't quite match the one you're driving through now, and the border with Encinitas will still mark the end of Solana Beach's completed portion of the trail.

If you're a longtime Solana Beach homeowner curious how infrastructure like this tends to move the needle on property values over time, or you're weighing what your own equity looks like as these projects wrap, The Lotzof Group knows this stretch of coast block by block. Request a confidential home valuation whenever you're ready to talk specifics.

Work With Us

Whether you’re seeking to embark on the journey of purchasing your first home, exploring new neighborhoods, or investing in properties, The Lotzof Group is your trusted resource to transform your dreams into reality.

Follow Me on Instagram